Once again, nothing much happened.
Bryan managed to squeeze in a few hours mid-week to re-connect the sink, and to do a few things here and there.
We also went to the granite fabricating place to see the template against the slabs and were able to see how the stone will be cut and where the seams would be. That was a lot of fun :) The slabs are gorgeous! It appears that the granite won't be installed till the first or the 2nd week of July.
Also, it was discovered that the door replacement order never went through b/c we had a question about the door dimension and somehow that got lost in the shuffle. A rush was placed on the order though, so hopefully we will see the doors soon. We also had to re-order some molding since the finish was crap (it looked like the pieces were not finished drying when they were put away).
The corner cabinet replacement (for the one that originally had a crack) came in at the end of the week.
The punch-list includes: install the replacement doors (5), install cabinet hardware, install cabinet shelves, install all molding and trim, install embellishments (2), stain the window trim, hook up microwave. After the granite is installed, Bryan will have to install the garbage disposal, the faucet and the soap dispenser and the airswitch for the disposal.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment