Wednesday, May 2, 2007

2nd week progress

More electrical work followed with partial demolition throughout the week.
The oven was disconnected so at this point we were at the mercy of left-overs that I cooked over the weekends, take-outs, and smooching off of friends. Under the oven we discovered NASTY old linoleum floor which was covered up with a plywood to level this area with the floor.




But at least we still have the sink!


Bryan installed one wall cabinet early in the week so we could see some progress - but on the wall which is most likely going to be done last due to the cabinet replacements we are still waiting for. This cabinet is a thing of beauty and is away from the rest of the action.




At the end of the week we also had the super susan base cabinet installed.