To get to this point, we needed 3 trips out of Bryan. He is so busy, most of these trips had to be at night.
First, the phone jack got taken care of. (99.5% completion)
Then, the dimmer was installed and the light switch box was brought out to be flush with the backsplash. The exposed side walls inside of the DW that were sanded down got stained, as well as the side edges of the toe-kicks adjacent to the DW toe-kicks (99.9% completion).
Finally, the shelf for one of the cabinets that came in damaged and was subsequently replaced with a wider shelf (Decora ?%!%!?) was cut down to fit the cabinet, and all the nail holes were replaced. YES!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
The journey was long, at times painful, stressful and frustrating, but the end product speaks for itself. The photos will be posted shortly!